ONE FC, ONE FUTURE

MS/HS Rendering

ES Rendering

Middle School & High School Additions & Renovations

The High School and Middle School floor plan includes:

  • A two story building addition (school-within a school design) that would house the 5th & 6th grade on one level and the 7th & 8th grade on the other level

    • Each floor would have its own restroom and commons area

  • Facility Infrastructure updates, such as, HVAC, electrical, etc.

  • Upgrades to the existing high school facility including classrooms, bathrooms, cafeteria, and hallways.

  • An added competition gymnasium that can be split into two basketball courts when some bleachers are retracted.

  • Additional ADA compliant restrooms.

Middle School and High School Floor Plan

Elementary School Additions & Renovations

The elementary floor plan includes:

  • Added secure entry to the front of the building

  • Administrative offices moved to the front of the building

  • Kindergarten classroom remodel

  • Special education classrooms remodel

  • Additional ADA compliant restrooms where the administrative/nurses office used to be.

The cost of the elementary additions and renovations is 1,763,000 dollars. 1,519,000 dollars of the project will be funded by QCPUF (Quality Capitol Purpose Undertaking Fund) and the other $244,000 will be funded from the bond.

The elementary additions and renovations qualify for the use of QCPUF funds because of the safety and security addition and ADA compliance.

Elementary School Floor Plan

Opportunities

  • School within a school design allows for grades 5th-6th and 7th-8th to have separate learning areas, and benefit from being at the high school campus.

  • Educational programs enhanced due to one site

    • Industrial Tech, AG, Business, Family Consumer Science, Choir, Band, and Art

    • K-8th Student Mentoring

    • Additional courses and learning opportunities

  • Additional square footage in educational spaces.

  • After school club/activity opportunities for Middle School students.

  • Increased instructional time due to efficiencies.

  • New competition gym at Jr./Sr. High School. (3 full size available courts on one campus).

Needs

  • Secure entry vestibule/office at the front of the Elementary and Jr/Sr High School buildings.

  • All restrooms and facilities compliant with handicap (ADA) accessibility codes.

  • Long term investment in our facilities.

  • Efficient use of space, staff, and resources.

  • Decrease transportation time.

  • Urgent facility infrastructure updates

Efficiencies

  • Reduced duplicated spaces (library, kitchen & cafeteria, art, band/choir, industrial tech, family consumer science).

  • We would gain efficiencies in the following areas: transportation, grounds, maintenance, staffing, utilities, cleaning, time.

  • Without the bond, it is estimated that the cost of infrastructure upgrades, and maintaining current facilities would cost $51 million over the next 20 years without gaining efficiencies.

  • Operational efficiencies of being at one site is projected to save $650,000 yer year, which could reduce the general fund levy by 5 cents.

  • Addition and remodel could lower the Special Building Fund by 1-2 cents.